constructiontech

Construction Technology

Moneymore Flood Alleviation

Project:
Moneymore Flood Defense Scheme

Location:
Derry

Scope:
The installation of approx. 520 linear metres of floodwall along both banks of the Ballymully River, together with approx. 230 linear metres of contractor designed flood barrier along the Coltrim River.

Contractor:
Dawson Wam Ltd.

AGP Design:
Envalira 108

Further information
For more information please contact us on:

Tel: +44 (0)28 37528 999
Fax: +44 (0)28 37528 928
info@sdg.ie